Calibre Exceeds the High-End of 2023 Production Guidance, Increasing Gold Production in 2024 to 275,000 - 300,000 Ounces With Significant Future Growth Coming From the Multi-Million Ounce Valentine Gold Mine in Canada
Calibre's Ore Control Drilling Intersects High-Grade Gold Outside of Reported Mineral Reserves Adding Additional Tonnes At The Valentine Gold Mine, Canada; Results Outside Mineral Reserves Include 46.53 g/t Gold Over 5.3 Metres and 17.16 g/t Gold Over 7.0
Calibre Reports Positive Drill Results One Kilometre Southwest of Valentine Gold Mine Resources Demonstrating Strong Discovery Potential Across the 32 Kilometre Shear Zone, Newfoundland & Labrador, Canada; Drilling Intersected 3.14 g/t Au Over 14.8 Metres
Calibre Continues to Intercept Bonanza Grade Drill Results Along the Multi-Kilometre Panteon VTEM Gold Corridor at the Limon Mine Complex; Drilling Intersects Include 111.92 g/t Gold over 4.1 metres and 33.60 g/t Gold over 2.6 metres
Calibre Delivers Record Full Year 2023 Gold Production of 283,494 Ounces, Exceeding the High End of Guidance; Setting Up for Stronger 2024 With Production Guidance of 275,000 - 300,000 Ounces